Project Description
Drayton Park
The London Borough of Islington required the development of Drayton Park to be Code for Sustainable Homes Level 4. To meet this criteria a low energy heating and ventilation solution was developed, which makes use of an exhaust air heat pump located within each apartment, to provide heating and hot water. The building also makes use of construction materials with low U values to reduce the overall heating demand. In addition, low flow sanitary appliances to meet the target required on water consumption for level 4 have been installed throughout.
Client: Base Build Services Limited
Location: London
Project Type: Multi Residential
Architect: Claridge Architects
Status: Completed